翻訳と辞書
Words near each other
・ Trim tab
・ Trim weights
・ Trim, 9th Ward High Roller
・ Trim, County Meath
・ Trim-Slice
・ TRIM11
・ TRIM15
・ Trillium luteum
・ Trillium maculatum
・ Trillium Model
・ Trillium nivale
・ Trillium oostingii
・ Trillium ovatum
・ Trillium persistens
・ Trillium petiolatum
Trillium Power Wind 1
・ Trillium pusillum
・ Trillium Railway
・ Trillium recurvatum
・ Trillium reliquum
・ Trillium rugelii
・ Trillium series
・ Trillium sessile
・ Trillium simile
・ Trillium stamineum
・ Trillium sulcatum
・ Trillium underwoodii
・ Trillium undulatum
・ Trillium vaseyi
・ Trillium viride


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Trillium Power Wind 1 : ウィキペディア英語版
Trillium Power Wind 1

Trillium Power Wind 1 ("TPW1") is a proposed 450 to 500 megawatt (MW) far-offshore wind farm in Canadian waters of northeastern Lake Ontario at least 17 km to 28 km from the nearest mainland. This well-supported renewable energy project is being developed by (Trillium Power Wind Corporation ), a privately owned Canadian-owned company headquartered in Toronto.〔http://www.trilliumpower.com/corporate/〕 TPW1 is positioned to be among the first offshore wind farms built in The Great Lakes.〔http://green.blogs.nytimes.com/2010/04/26/who-will-build-the-first-offshore-wind-farm-in-north-america/〕
== Project description ==

On May 19, 2011 Trillium Power Wind Corporation (gave notice to the McGuinty Government that if its targeted action against Trillium Power was not corrected it would initiate an action suing the Government of Ontario for 2.25 Billion dollars. ) No correction was made as requested. Therefore, on September 28, 2011, Trillium Power Wind Corporation filed its claim in the Ontario Superior Court of Justice and was assigned the court file # CV-11-436012. While the legal claim was initiated against the government of Dalton McGuinty, Trillium Power has continuously stated in the media that it does not hold Premier Wynne responsible for creating the cause of the litigation. Instead, Trillium Power has stated that litigation was the last option and was only taken when the McGuinty government would not even meet or discuss options to correct their targeted action to harm Trillium Power. Trillium Power has always sought solutions that are in the long-term benefit of all Ontarians, the environment and the economy.
The TPW1 ''far''-offshore wind site is acknowledged as the premier site in North America and especially The Great Lakes. The TPW1 site is located in northeastern Lake Ontario, approximately 38 km southwest of Kingston, Ontario SW on the shoals of Main Duck Island.〔http://www.trilliumpower.com/energy/project-wind-1/〕 The project, as currently planned, will consist of approximately 90 to 100 either 5.0 MW or 6.0 far-offshore turbines and two offshore substations linked to the Lennox Transmission Station by way of an underwater cable. The total project cost is estimated at $1.5 billion CDN of private capital with no cost to taxpayers.〔
The wind farm will produce between 450 and 500 megawatts (MW) of clean electricity with a net capacity factor of 43%, which is equivalent to the amount of power consumed by a minimum of 130,000 typical Ontario households.〔 TPW1 will offset at least 1.5 million tonnes of CO2 emissions from coal-fired generation and 931,745 tonnes of CO2 emissions from natural gas generation every year.〔 All power generated by the project will be sold to the Ontario Power Authority under a 20-year minimum Power Purchase Agreement. Under Ontario's ''Green Energy and Green Economy Act'' adopted in May 2009, offshore wind facilities of any size will receive a 19¢ per kilowatt hour (kWh) Feed-in tariff.〔http://fit.powerauthority.on.ca/〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Trillium Power Wind 1」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.